by Team Stittsville | Sep 14, 2024 | Information
La version française suit Originally published September 28, 2023 Current as of September 12, 2024 / À jour en date du 12 septembre 2024 Fewer cars and less congestion near schools result in a safer environment for students. For more information and tips, visit the...
by Team Stittsville | Aug 2, 2024 | Information
La version française suit Beginning in August, the City of Ottawa will begin construction along Johnwoods Street to improve existing pedestrian and cycling connectivity conditions as well as overall street improvements. What: A new 3.0m wide multi-use pathway will be...
by Team Stittsville | Jul 26, 2024 | Information
La version française suit As part of the City’s Pedestrian Accessibility and Intersection Ramping (PAIR) program, accessible pedestrian facilities will be improved that were not captured through previous road reconstruction or development projects. The improvements...
by Team Stittsville | Jul 26, 2024 | Information
La version française suit City crews will be installing traffic calming measures at several new locations in the coming weeks, including flex stakes on the following streets: Abbott Street East, between Rouncey and Triangle Beverly Street, between Birdstone and West...
by Team Stittsville | Jul 13, 2024 | Information
La version française suit In recent months several serious collisions have occurred at the intersection of Shea Road and Flewellyn Road just south of Stittsville, including two this week alone. The intersection is just south of Stittsville in Ward 21 (Rideau-Jock) and...